Service concept

Continuous improvement
Customer satisfaction
Customer satisfaction is the criterion for testing product quality. We listen to the voice of customers, grasp the needs of customers, customer satisfaction to define the quality standards, and try our best to improve customer satisfaction and loyalty.
Why choose us?
We (ALVC) is a professional manufacturer of custom heat sinks, providing custom cooling solutions for the global market, include power supplies, LED lighting, medical equipment, new energy vehicles, computers, 5G/6G communications, solar energy, laser equipment, amplifiers, industrial controls, and aerospace. Our main business is custom micro-channel array heat pipe (ALVC) heat sink, copper/aluminum round heat pipe heat sink, liquid cold plate, loop thermosyphon heat sink, 3DVC heat sink, roll bond plate heat sink, etc. We (ALVC) have more than 24 years of experience in custom radiator products. We have a professional custom radiator R&D team, one-stop processing and manufacturing equipment, and strict quality control.
We (ALVC) provide complete thermal management services: from computational fluid dynamics simulation, model validation and improvement of existing systems, thermal management architecture, detailed design and validation testing, to high volume delivery.
More than 25 years of heat dissipation industry experience
Our engineering team has many years of experience in thermal design, We (ALVC) becomes an extension of your engineering team. Working with us, our team can not only optimize the design, but also help finalize the product specifications to meet the overall needs of customers.
Free thermal simulation analysis
We have senior heat dissipation R & D personnel, the use of international advanced thermal simulation software, for customers personalized cooling needs to provide free thermal simulation analysis, greatly save your R & D cycle and development prototype costs.
Advanced production equipment
We have advanced production equipment and inspection equipment, strictly comply with the requirements of ISO9001 quality management system and ISO14001 environmental management system standard operation.
Factory direct sales, cost-effective
No intermediary channels, improve communication efficiency and reduce intermediary costs. If you are looking a custom heat sink manufacturer, then We (ALVC) are your right choice!
Customization
Process
Thermal design is to release heat from the heat source to resolve the power loss and transfer heat under operating conditions.
The thermal design includes evaluation key factors such as the amount of space available for thermal design, the thermal design power,
the temperature of the chip case, the ambient temperature, and the thermal resistance.
How we design a thermal solution for customer?
1
Solution
2
Simulation
3
Sample testing
4
Prototype
5
Product optimization
STEP1-Solution design (2days)
If customer do not have drawing, Customer should share us below key information, Base on the key information, Our engineers will design the most reasonable concept heat sink, including the selection of materials (Al/Cu.), the application heat pipes, the direction of air flow, and the area of fins. Provide design CAD drawings to customer to confirm.
01
Keep out space
How much space is left for thermal design? For example, the device needs to install a heat sink, the space will determine the size of the heat sink, or the heat dissipation efficiency
02
Thermal design power
The heat source in the device, for example, how high is the power when the chip is operating?
03
Temperature of chip case
How high will the case temperature rise when the chip is in operation?
04
Ambient temperature
What is the ambient temperature range where the device is located?
05
Thermal resistance = (Tc-Ta)/TDP
Ease of heat transfer. A high thermal resistance value means that heat is difficult to transfer, while a low thermal resistance value means that heat is easy to transfer.
06
Active or fanless solution
Evaluate whether the convection effect of the device is good enough and determine whether it is necessary to increase the wind dispersion.
07
Gravity direction
The direction of action of the heat sink will be affected by gravity, so it must be understood whether the installation direction of the device is vertical or horizontal.
STEP2-Simulation (1 day)


STEP3-Sample testing (3-5 days)
After the simulation results are approved by the customer, we manually make samples according to the drawings for mock test in our laboratory.
STEP4-Prototype (5-7 days)
We provide several samples for customers to install and test.
STEP5-Product Optimization (5-7 days)
Optimize the product again before mass production. Reduce cost, weight and volume for customers as much as possible.
