Data Center
Keywords:
AI Compute’s Real Bottleneck Is Heat: 250W to 1,400W | ALVC
From 250W in 2016 to 1,400W per AI accelerator in 2025 — a 5.6× power surge. Why heat flux, package-level thermal resistance, and system-level cooling now set the limit on sustainable AI compute.
How a Copper Vapor Chamber Works: Spreading Hotspot Heat | ALVC
How a copper vapor chamber spreads hotspot heat laterally: evaporation, vapor transport, condensation and wick return — and why the capillary limit means you must design the whole cooling chain.
The Role of Liquid Cooling Plates in Data Centers
The Role of Liquid Cooling Plates in Data Centers
Keywords:
Latest product
Latest News



